Request a site inspection

Water

Tunnel water ingress controlLeaks and inflow stopped in tunnels, shafts and underground structures.Crack and joint injectionLeaking cracks and joints sealed, and structural cracks bonded, in concrete and masonry.Waterproofing and polyurea liningsPU membranes and polyurea linings for decks, tanks, tunnels and water structures.

Tunnels

Pre- and post-excavation groutingWater cut off and weak ground consolidated ahead of the face; voids closed behind it.Cavity and void fillingVoids above tunnel crowns, behind linings and under slabs filled without loading the support.Tunnel rehabilitationOld and operating tunnels: seepage stopped, ground consolidated and lining repaired, under traffic.

Ground

Track and slab re-levellingSettled ballastless track and slabs lifted back to level by PU injection, on live lines.Permeation and chemical groutingWeak, loose or wet ground strengthened and sealed by resins and gels that fill it without moving it.TAM groutingStaged grouting through sleeve pipes for shafts, foundations and deep excavations.Curtain and consolidation groutingSeepage cut-offs and foundation consolidation for dams, barrages, shafts and structures.Ground investigation and monitoringERT, GPR and MASW surveys, boreholes, lab tests and instruments, before and after treatment.

Rock, slopes and mines

Rock bolting and self-drilling anchorsRock bolts, self-drilling and prestressed anchors for tunnels, portals, slopes and caverns.Slope stabilisationSoil nails, anchors, mesh, drainage and rockfall barriers for slopes above roads, railways and towns.Mine shaft and strata treatmentWater sealed in shafts and declines; weak roof and face strata consolidated with resins and bolts.
All services →Grouts and resins we make →

Railways

RailwaysSettled track, transition zones and wet tunnels on running lines.

Tunnels and metro

Tunnels and metroWater, cavities and weak ground in tunnels, shafts and metro works.

Hydropower and dams

Hydropower and damsSeepage, foundations, tunnels and slopes on hydro projects.

Mining

MiningWater in shafts and declines, and weak strata at faces and in roadways.

Water, ports and highways

Water, ports and highwaysWater tunnels and shafts, micro tunnels, pipelines, manholes and highway slopes.

Heritage and buildings

Heritage and buildingsSettlement, cracks and leaks in heritage structures and buildings in use.
All industries →Projects →

Services

Tunnel water ingress controlPre- and post-excavation groutingCavity and void fillingTunnel rehabilitationTrack and slab re-levellingPermeation and chemical groutingTAM groutingCurtain and consolidation groutingRock bolting and self-drilling anchorsSlope stabilisationCrack and joint injectionWaterproofing and polyurea liningsMine shaft and strata treatmentGround investigation and monitoring

Industries

RailwaysTunnels and metroHydropower and damsMiningWater, ports and highwaysHeritage and buildings

Sales

+91 99100 18144WhatsApp +91 99100 18144connect@geoconstech.com

Metro

Delhi Metro CC-04, Azadpur

Two tunnel boring machines were held about 30 m below ground near the Gurudwara emergency egress shaft at Rameshwar Nagar, Azadpur, in loose, saturated ground with the water table 6.30 m down. We controlled the water and consolidated the ground around them, and the machines were retrieved.

Period
January to March 2017
Location
Gurudwara emergency egress shaft, Rameshwar Nagar, Azadpur
Type
Metro shaft and tunnels
End client
Delhi Metro Rail Corporation
Contractor
CEC-CICI JV

Project recordRecorded in our project register and case study, January to March 2017.

2

Tunnel boring machines retrieved.

6.30m

Depth of the water table below ground.

30m

Approximate depth of the machines.

  • Water ingress controlled.
  • The machines retrieved.

The problem

Loose sand flowing in under water pressure

The shaft had been sunk to 25 m. With groundwater 6.30 m below ground, loose, low-plasticity silty sand flowed into the excavation under water pressure, causing settlement and erosion.

The ground was silty clay with gravel over poorly graded sand, and there was little room to work.

What we did

A watertight block around the machines

  • DrucHyd 2C injected through perforated pipes into the ground around the machines.
  • R32N self-drilling anchors to reach and reinforce the loose ground.
  • The resin permeated the sand and knitted through thin clay bands, forming one consolidated, watertight block.
Controlling water to free trapped TBMs below a metro shaftLong section of a metro shaft sunk to 25 m with groundwater at 6.30 m. Tunnel boring machines are held about 30 m down in loose, saturated silty sand. Perforated pipes and self-drilling anchors from the shaft carry water-reactive PU into the ground to form a consolidated, watertight block around the machines. TBM6.30 m25 mABOUT 30 mSHAFT123456
  1. Note 1: Groundwater 6.30 m below ground level.
  2. Note 2: Emergency egress shaft sunk to 25 m.
  3. Note 3: Two tunnel boring machines held about 30 m down.
  4. Note 4: Loose silty sand flowing in under water pressure, with settlement and erosion.
  5. Note 5: DrucHyd 2C injected through perforated pipes, with R32N self-drilling anchors.
  6. Note 6: A consolidated, watertight block around the machines.
Geo Constech
Delhi Metro CC-04 · Azadpur
Contractor CEC-CICI JV · DMRC
Jan–Mar 2017 · Not to scale