Track lifting on the USBRL project for KRCL: the track was lifted by 136 mm, and the result was certified in February 2026.

Year
2026
Location
Sangaldan, Katra-Dharam section, USBRL, Jammu & Kashmir
Type
Railway Track Lifting
Client
Konkan Railway Corporation Ltd (KRCL)

Project Details

Geo Constech carried out track lifting for Konkan Railway Corporation Ltd (KRCL) on the Udhampur-Srinagar-Baramulla Rail Link (USBRL) project, in the Katra-Dharam section at Sangaldan.

Method

The track slab was lifted by slab-jacking: polyurethane resin was injected under the slab and the lift was made in controlled stages of 15 to 20 mm. Fibre-reinforced cement grout followed to lock in the lifted level.

Results

  • Track lifted: 136 mm.

  • Result certified in February 2026.